Prepare detailed construction schedules for assigned projects, including resources and cost loading in Primavera P6. - Qatar - Ar-Rayyan

job description


Planning Engineer (MEP) - Local Hiring 



Location – Al Saad /  Al Khor ( Exit 29 ) 



Prepare detailed construction schedules for assigned projects, including resources and cost loading in Primavera P6.  


Identify the project deliverables, milestones and create work breakdown structure for the project(s). 


Visit sites, verify progress data and produce daily, weekly and monthly reports, S-Curves , Histograms, Risk Registers. 


Perform Delay Analysis, Prepare EOT claims, identify irregularities and discrepancies relating to time.




Required years of experience : 5-7 Years Working Experience


Valid QID Required 


Work timings and schedule : 7.30am to 5.00pm (6 days a week) 




Interested candidates pls share cv at -+974- 51240111 (whtsapp )


Job requirements

  • years experience

    Not Set

  • Required gender

    Not Set

  • اللغة الانجليزية

    أساسيات

  • Required age

    Not Set

  • Professional level

    Not Set

  • Educational level

    Not Set

  • مايكروسوفت أوفيس

    جيد جدا

Salary and type of work

  • Salary

    غير محدد

  • employment type

    undefined

Job features

Short link to the job https://www.el7far.com/go/?p=226279

Please be careful of fraudulent advertisements. Real jobs do not require paying any fees or money when applying for them. The site is not responsible for such advertisements, so please report fake jobs so that they will be deleted immediately

اتقدم الى اكثر من 2000 وظيفة متاحة الان فى الكويت مع اكبر موقع توظيف بالكويت www.kuwaitjobstoday.com