Syed Azam Ali Shah

electrical site engineer

send message

Last seen: Since 1 Year 1 Month   registration date : Since 1 Year 1 Month

primary data
male
1996-02-19
engineersyed246@gmail.com
+966535201609
Saudi Arabia
Al-Jubail
وظائف من مواقع الشركات Jobs from corporate sites
6 year
Experience and qualifications
Experience

·        I have been working for the protection and maintenance & Testing and commission of 33kv/11kv sub station and actively associated with its maintenance Testing and commission work

·        Actively involved in erection Testing & commissioning operation and maintenance of following 33kv/11kv power system equipment

·        Power transformers circuit breakers current transformers, potential transformers, lightning arresters, capacitor bank and line & bus isolation 33kv/11kv all equipment trouble shooting of power system

·        Relay Protection Testing, Relay test software, Maintenance testing, Secondary injection tests, Commissioning test, Differential relay, Directional relay, Insulation resistance tests, Additional electrical tests, Battery testing, Earth fault relay, Factory tests, Frequency, General inspection of equipment, Generator protection relays, Instantaneous testing, Over voltage, Relay voltage supervision, Rotating machines testing, Verification of relay setting.

 

·        Ct testing Polarity test, Winding resistance, Insulation resistance test, Ratio test, Burden test, Instrument transformer field testing, Knee point test, Current transformer, CT Analyzer, Magnetization curve, Nominal ratio, Revenue protection with meter site testing, Transformation ratio. Earthing system of power system equipment.

·        Inspection of control and Relay panel, preparation of test Report and cable schedule for substation power plant

·        Monitoring program of the project activities starting for Earthing, cable laying termination, testing and commissioning unit final hand over in compliance with specifications, and approved documents/drawings

·         Commissioning the control &relays panel for transformer bus couple RS transfer bus couple r & line feeder schemes and one &half scheme

·        Testing of various types of protection numerical relays, electromagnetic and static relays of different

·        Responsible for testing and commencing of substation equipment's link protection panels switch gear, circuit breakers transformers better

·        System as per scheduled plan

·        Operation and maintenance of sub-station, l

·        Trouble shooting of all electrical circuits, control and protection circuit

·        Scheme modifications as per customer requirement test report submission

·        As built cable schedule preparation and all site activities to satisfy the custom